Timezone Converter
A control that displays clocks with different timezones based on the configuration and selection

         
timezone clock

PDF Form Fill
A control to fill a PDF Form within a Canvas App without the use of a premium flow connector

         
pdf form

Custom Rich Text Editor
A control that provides a custom rich text editor based on TinyMCE to address the limitations of ...

         
rich text tinymce

Address Lookup
A control to select an address using Canada Post API

         
address canada

PCF Two Options Button
A control for Model-driven apps to display Two Options fields as clickable buttons with colorful ...

         
button two options

OptionSet with Descriptions
A control that displays a tooltip based on the Option Set description text.

         
optionset

Phone Number Format
A control using Google Phone Library to format phone numbers.

         
phone number

SharePoint Drag & Drop PCF
A control to drag and drop files to SharePoint libraries.

         
sharepoint attachments drag and drop

Inline Text Editor
A control that accepts HTML text and renders part of HTML content as editable

         
text editor

PCF QR Code
A control to convert text to a QR Code, with a right click option to hide it

         
qr code

N-Gram Word Cloud
A control that provides Power Apps users with a customisable word cloud that implements N-Gram.

         
world cloud n-gram

Universal Gantt Chart
A control to show a Gantt chart.

         
gantt